After waiting for so long to see things move along with the house, it seems as though we have shifted into warp speed the past two weeks. Since Andrew and Juan arrived two weeks ago, the house is rockin' and rollin'. After the excavation was completed, the footers were poured (concrete base rectangle for the house to be built upon).


READY FOR THE CONCRETE



POURING

It seems as though something always has to go wrong, and for this step the mishap was when the concrete trough broke! Not to worry, the concrete men scrambled to chain the pieces together so that the work could forge ahead.



LIMPING ALONG


HARD AT WORK


FINISHED AND CURING