Paint: First Floor Complete
As of February 6, 2010, the paint on the first floor is complete (minus the touch-ups that need to be fixed). Mindy was hoping to be tiling the hallway from front door to back door this week. Instead she has been on the couch with a broken ankle. At least the paint was at a nice stopping point when this happened. Work will resume as soon as possible. And no, she did not fall off of a ladder. It was an unfortunate slip on the ice outside.
And a big thanks to Linna for coming up to help us paint a few weeks ago.
KITCHEN -- this is where the meals are cooked; cabinets will be coming soon!
DINING ROOM
HALL -- colors are "Koi Pond" on walls and "Alabaster" on ceiling & trim (Koi Pond is a mellow sage-green that we love for its neautrality yet colorful feeling)
NOAH'S WORK SHOP -- getting started
NOAH'S WORKSHOP -- NEW WALL
TEMPORARY KIDS' BEDROOM
BATHROOM - colors are "Natural Choice" on walls and "Alabaster" on ceiling and trim (off-white & white variations)
BATHROOM -- almost done
And a big thanks to Linna for coming up to help us paint a few weeks ago.
KITCHEN -- this is where the meals are cooked; cabinets will be coming soon!
DINING ROOM
HALL -- colors are "Koi Pond" on walls and "Alabaster" on ceiling & trim (Koi Pond is a mellow sage-green that we love for its neautrality yet colorful feeling)
NOAH'S WORK SHOP -- getting started
NOAH'S WORKSHOP -- NEW WALL
TEMPORARY KIDS' BEDROOM
BATHROOM - colors are "Natural Choice" on walls and "Alabaster" on ceiling and trim (off-white & white variations)
BATHROOM -- almost done