Tuesday, March 23, 2010

Bathroom Stuffs

We have been waiting on some tools to come in the mail in order to install our wood flooring. In the meantime, we have been working on the bathrooms. Noah has started installing the drywall in the master bath so that Mindy can work on mud, tape, prime, paint, tile, when she does not have anything else to work on. Also, he has to build the foundations for the master shower and a future soaking tub (Greek Tub) before the tile can be installed. We will be doing a glass block wall for our double shower, with a doorless entry. At the far end of the shower is where the tub will eventually go, but for now we will build the "box" for it to drop into, and then in a few years as funds permit we will purchase and install the tub. Also, Mindy has finally installed the towel bars, toilet paper holder, hooks in the bathroom on the main floor. It is nice to get that checked off of the to-do list.


Stub-outs for vanity & toilet (fun hobbit-door will be a storage room)


sink stub-out & doorway to bedroom


double shower stub-out


transom window in shower


The beginnings of the framing of shower & tub


Tools required for hanging bathroom hardware


Oil-rubbed bronze & squares are the theme for our house



0 Comments:

Post a Comment

Subscribe to Post Comments [Atom]

<< Home